Zem: 60 or 72 V, LFP or NMC?

A workshop calls us for "a 72 V pack", and our first question is: why 72 rather than 60? Often the answer is that it was written on the old pack. That is a fair start, but it is not a reason. Here is what each choice actually changes, with the numbers.

In this article
  1. The voltage is set by the controller, not by you
  2. What 72 V really buys: less current
  3. The numbers for a 60 km pack
  4. LFP or NMC: volume against cycle life
  5. Peak current, again
  6. A zem pack is more than a stack of cells
  7. What to send us

The voltage is set by the controller, not by you

Let us start with the point that closes the discussion: the motor controller has an input voltage range, and it is not negotiable. A 60 V controller will not accept a 72 V pack, and forcing it destroys it — sometimes immediately, sometimes after a few weeks, which is worse because nobody makes the connection any more.

So before anything else, note two numbers from the controller: the nominal voltage and the maximum permissible voltage. If you change voltage, the controller has to change too, and often the display with it.

If the old pack is still there, photograph the controller label and the pack label, and send us both. That is quicker and safer than describing them from memory.

What 72 V really buys: less current

At equal power, voltage and current move in opposite directions. A 2,000 W motor draws 33 A at 60 V and 28 A at 72 V. The gap looks modest; its consequences are not.

  • Losses in cables and connectors vary with the square of the current. Going from 33 to 28 A is roughly 28% less loss in the same length of cable.
  • The BMS can be smaller. For the same 60 km pack, our assistant proposes a 50 A BMS at 60 V and a 40 A one at 72 V.
  • Connectors run cooler, and on a zem that is the first failure point: a loose lug that heats, oxidises, then heats more.

Against that, a 72 V pack carries more cells in series, so more connections, more balance leads, and a BMS with more channels. For the same budget, it is slightly more workshop time.

The numbers for a 60 km pack

Take a zem using 25 Wh per kilometre — a common figure for a loaded two-wheeler — and a target range of 60 km, that is 1.5 kWh usable. Here is what our sizing assistant returns, at both voltages, in high-energy NMC cylindrical cells.

  • At 60 V: 16S7P, 112 cells, 57.6 V nominal, 2.02 kWh, 9 kg, 50 A BMS.
  • At 72 V: 20S6P, 120 cells, 72.0 V nominal, 2.16 kWh, 9.7 kg, 40 A BMS.

Eight more cells, seven hundred grams more, and ten amps less to carry. On a vehicle that runs all day and starts under load, those ten amps matter more than those seven hundred grams.

Note in passing that "60 V" in NMC means sixteen cells in series, so 57.6 V nominal. That is a trade convention, like 48 V from sixteen LFP cells. Nobody builds seventeen cells just to land exactly on sixty.

LFP or NMC: volume against cycle life

That question is decided by the box. Compare two cells from our catalogue, at typical manufacturer values.

  • 21700 NMC high drain: 14.4 Wh per cell, 68 g, that is 212 Wh/kg, 35 A continuous, about 500 cycles.
  • 32700 LFP: 19.2 Wh per cell, 145 g, that is 132 Wh/kg, 18 A continuous, about 2,500 cycles.

NMC stores 1.6 times more energy per kilogram and takes nearly twice the current per cell. LFP lasts five times more cycles. There is no right answer in the abstract, there is a right answer for your use.

On a zem, space is tight: the box is what it is, and a pack that does not fit is no use. That is why cylindrical NMC remains the default choice on this vehicle. For a three-wheeler or a light utility, where volume is less constrained, LFP becomes interesting again — especially in commercial use, where the vehicle is charged twice a day and cycles pile up fast.

Peak current, again

A zem does not run at constant power. Starting on a slope, loaded, is the moment that sizes everything. The inrush there reaches two to three times the steady state, for a few seconds.

With 112 cells in 16S7P, the NMC pack in our example has seven parallel branches: at 35 A per cell continuous, the pack’s theoretical limit is well beyond what the motor asks for. The BMS becomes the limit, and that is why it is chosen on the peak.

Give us the motor power and the gradient of your usual route rather than the range alone. Two zems with the same range, one in Cotonou and one on a hilly track, do not need the same BMS.

A zem pack is more than a stack of cells

This is the difference between a pack that lasts two years and a pack that comes back to the workshop after three months. A two-wheeler vibrates, hits potholes, rides in the rain and sometimes gets dropped.

  • Cells must be immobilised, not merely laid in place. A cell that moves a millimetre at every bump eventually breaks its weld, and a weld breaking under load makes an arc.
  • Balance leads are routed and secured. It is the thinnest harness in the pack, so the first to break, and a broken balance lead blinds the BMS to an entire cell.
  • The enclosure must shed water, not trap it. A sealed box, once breached, keeps the water inside; a box vented at the bottom lets it out.
  • A fuse on the main output, rated above the motor peak and below what the cables can take. The BMS cuts on overcurrent, but the fuse is what remains once the BMS itself has failed.

We deliver every pack with its test report: measured capacity, each cell’s voltage and internal resistance. On a vehicle that record serves mainly as a reference: if a cell drifts from the others a year from now, you will know by how much and since when.

What to send us

For a quote that holds, four pieces of information are enough, and they take ten minutes to collect.

  • The controller’s voltage and maximum current, read from its label.
  • The motor power.
  • The internal dimensions of the box, height included.
  • The target range, and the kind of route.

Also worth reading

  • 18650, 21700 or 32700: which format?

    The same 5 kWh pack, built in five formats: cell count, mass, welds and workshop time. The format decides more than the chemistry.

  • The BMS explained simply

    What a BMS actually does, what it does not do, and the arithmetic showing what a single weak cell costs an entire pack.