Notes
Technical notes
What we end up explaining on the phone, written down once.
-
Lead or LFP: the real ten-year cost
Why a lead-acid bank costs more than an LFP pack over ten years, worked out in cycles and delivered energy rather than in currency.
Read -
Sizing a 48 V battery
The six-step method, with one example worked end to end: from daily consumption to the cell count and the BMS rating.
Read -
Zem: 60 or 72 V, LFP or NMC?
Two questions decided together, with the numbers for a 60 km pack: voltage, current, mass, cycle life and BMS rating.
Read -
Lithium batteries above 35 °C
Why a datasheet quoted at 25 °C does not describe your installation, and the six decisions that change in the Beninese climate.
Read -
18650, 21700 or 32700: which format?
The same 5 kWh pack, built in five formats: cell count, mass, welds and workshop time. The format decides more than the chemistry.
Read -
The BMS explained simply
What a BMS actually does, what it does not do, and the arithmetic showing what a single weak cell costs an entire pack.
Read -
Spotting an inflated capacity
The plausibility check that demolishes a listing in thirty seconds, and the seven checks to run on a cell before building it in.
Read -
Maintaining and storing a lithium battery
What a long outage does to a pack, the self-discharge arithmetic over six months, and the maintenance routine that fits in fifteen minutes a quarter.
Read
Quote
Your request
The fields marked optional really are. Fill in what you know.
No prices online: every requirement differs, so every quote is priced on its own.