Français Quote

Notes

Technical notes

What we end up explaining on the phone, written down once.

  • Lead or LFP: the real ten-year cost

    Why a lead-acid bank costs more than an LFP pack over ten years, worked out in cycles and delivered energy rather than in currency.

    Read
  • Sizing a 48 V battery

    The six-step method, with one example worked end to end: from daily consumption to the cell count and the BMS rating.

    Read
  • Zem: 60 or 72 V, LFP or NMC?

    Two questions decided together, with the numbers for a 60 km pack: voltage, current, mass, cycle life and BMS rating.

    Read
  • Lithium batteries above 35 °C

    Why a datasheet quoted at 25 °C does not describe your installation, and the six decisions that change in the Beninese climate.

    Read
  • 18650, 21700 or 32700: which format?

    The same 5 kWh pack, built in five formats: cell count, mass, welds and workshop time. The format decides more than the chemistry.

    Read
  • The BMS explained simply

    What a BMS actually does, what it does not do, and the arithmetic showing what a single weak cell costs an entire pack.

    Read
  • Spotting an inflated capacity

    The plausibility check that demolishes a listing in thirty seconds, and the seven checks to run on a cell before building it in.

    Read
  • Maintaining and storing a lithium battery

    What a long outage does to a pack, the self-discharge arithmetic over six months, and the maintenance routine that fits in fifteen minutes a quarter.

    Read

Quote

Your request

The fields marked optional really are. Fill in what you know.

No prices online: every requirement differs, so every quote is priced on its own.

My quote request